Alki Elementary

3010 59th Ave. SW
Seattle, WA 98116
Main Office: 206-252-9050
Main Office: 206-252-9050
Fax: 206-252-9051

Alki School Profile

Attendance Area School Attendance Area

School Leadership and Board District

Building History and Information Building History

Community Partners at Alki Community resources and programs at Alki Elementary


CSIP and School Report

About CSIP

The Continuous School Improvement Plan (CSIP) is an action plan for each school that identifies the areas a school plans to focus on in the current and coming school year, the performance goals they want students to achieve, and how the school plans to collaboratively meet these goals.

The plans are updated regularly to reflect the strategies being used at each school. This document also serves as the school-wide improvement plan for our Title I schools

About School Reports

School Reports show a brief snapshot of a school’s academic growth, student climate, accountability, family and staff engagement, and overall school performance.

School reports are produced by the State Office of Superintendent of Public Instruction for each school and district in the state and updated periodically throughout the year as data becomes available.

Questions about school reports? Contact us: Research and Evaluation Department, research@seattleschools.org

About School Climate Surveys

School Climate Surveys are used for school-level improvements, climate surveys are given to all staff, students and families each year. The staff and student surveys are given to respective groups in person at schools; the family survey occurs in the spring.

Alki Levy Projects

Here you will find an overview of work completed by school levies.

Levies are a primary funding source for construction, renovations, safety and security upgrades, major maintenance, classroom technology and technology infrastructure, academics support projects and athletic field and track improvements.

Seismic Report: The safety of our students and staff is our top priority. Earthquake safety/seismic improvements projects are funded through the voter-supported Building Excellence (BEX) and Buildings, Technology and Academics (BTA) capital levies. Visit the Capital Projects webpage to read the most recent report.

Building Excellence (BEX) at Alki

BEX V

The Building Excellence V (BEX V) Capital Levy will fund a new replacement school building for Alki Elementary School. It will also provide technology equipment and services, such as computers, peripherals, printers, and other technology for teaching and learning.

Read more about this project.

About BEX

The Building Excellence (BEX) Capital Levy funds projects such as those that modernize or replace aging buildings, fund technology for student learning, address earthquake and safety issues and major preventive maintenance needs throughout the district.

Buildings, Technology and Academics (BTA) at Alki

BTA II

In 2004, Seattle voters approved the BTA II capital levy. The levy funded nearly 700 facility improvement projects and technology upgrades at every school in the district. 

  • 2009: Roof replacement (phase 2 of 2), lunchroom windows were replaced and new window coverings installed. Hallway floor tiles were replaced. Carpet replaced in six classrooms. Refurbishment and replacement of mechanical equipment, as well as new equipment controls, has provided improvements in indoor air quality and energy savings.
  • 2008: Roof upgrades (Phase I).

BTA I

The $150 million Buildings, Technology and Academics/Athletics (BTA I) capital levy was approved by voters in February 1998. BTA I funded more than 465 small and large facility projects at every school in the city. The projects included safety and security upgrades, roof and window replacements and technology and athletic field upgrades.

  • 2003: Elevator
  • 2001: Wide Area Network Phase II
  • 2001: Wide Area Network

About BTA

The Buildings, Technology and Academics (BTA) Capital Levy supports the district’s long-range plans to upgrade and renovate aging school facilities and address enrollment growth.

The BTA IV Capital Levy was approved by voters in 2016. Seattle Public Schools will receive these levy funds from 2017 through 2022.