Coe

Coe Elementary School Classroom Addition

Completed, December 2021

Students began attending classes in new addition on Jan. 4, 2022.

Read the News Story

Project Progress Photos

side angle view of three story building with a peaked roof under construction
Street view from northeast – Aug. 2021
front of three story building with a peaked roof under construction
Learning commons in center of new addition – Aug. 2021
siding being installed on a 3-story building by a person in a lift
Window mockup from southeast – Aug. 2021
a window in a room under construciton
Taping insulation on 2nd floor classroom – Aug. 2021
a room with cabinets being installed
Classroom casework installation – Sept. 2021
first floor of a building under construction with orange material on outside
Window installation nearly complete – Sept. 2021
a concrete and steel stairway
Window installation nearly complete – Sept. 2021
a ceiling with metal tubing and air handling vents
Mechanical rough-in nearly complete – Sept. 2021
the corner of a two story building with new siding
Siding installation complete with exterior painting in progress – Oct. 2021
One side of two story building with windows and peaked roof over the entry
Entry with siding nearly complete – Oct. 2021
looking down a stairway from the top toward a landing where it reverses. there are windows straight ahead
Interior stair painting nearly complete – Oct. 2021
a classroom with white boards and carpet installed and the ceiling tiles stacked on the floor
Ceiling installation in a classroom – Oct. 2021
a classroom space that has carpet and some cabinets installed with the ceiling grid still empty
Classroom cabinets completed – Oct. 2021
a white boared has tack board on each side and electrical outlets above and below
Wall coverings and tackable surfaces being installed – Oct. 2021
a small space with a toilet has blue tiles on two walls
Restroom tiling nearly complete – Oct. 2021
a wall in a classroom has a brown material on the lower half and white paint on the upper half
Wall covering installation nearly complete – Nov. 2021
a hallway with a wooden cabinet with cubby holes
Hallway casework complete – Nov. 2021
a three story building with a lighter center area bumped out with a peaked roof
Dec. 2021: New addition with exterior painting nearly complete
a hallway with a stairway in the middle
Dec. 2021: Hall and stairway complete
a stairway with stairs going up and stairs going down. the railings are metal with wood tops
Dec. 202: Interior stairway
interior classroom view with windows in corner and smart board/presentation station to the left
Dec. 2021: Completed classroom
a space with windows and doors to classroom
Dec. 2021: Learning Commons

About the Project

The original Frantz Coe Elementary School, built in 1907, was destroyed by fire in 2001. The current 75,214-square-foot building was constructed in 2003. This project will construct a six-classroom addition.

Design : Mahlum Architects

Construction: Western Ventures Construction, Inc.

Project Manager : David L. Jackson

Funding Source: Funded by State of Washington Distressed Schools Grant.