
Roosevelt High School
1410 Northeast 66th
Street
Seattle, WA 98115
(206) 252-4810
| Project Description |
Demolition of the gymnasium, cafetorium and shop; historic renovation of the 1922 and 1928 buildings. Add an addition to the north side of the main building to house a new gym, cafeteria and performing arts center. |
| Building Size | 256,483 gross square feet |
| Capacity | 1,600 students (grades 9-12) |
| Site Size | 9.5 acres |
| Total Cost | $93.8 million |
| Completion Date | September 2006 |
| Architect | Bassetti Architects |
| Contractor | Hoffman Construction |